System functionPreparing to test
Before starting the IBC leak test, the operator places the container on the testing area. The system is compatible with various IBC sizes and automatically adjusts the sealing frame. Once the IBC is secured, the air line is connected, and the PLC is configured via touchscreen. Optionally, conveyor systems can automate the IBC loading to save time and reduce operator effort.